DESCRIPTIVE ANALYSIS OF THE CONSERVATION PROJECT

1856 - The residential origin of the Officers' Pavilion.
Padiglione Ufficiali -disegni storici, piante e sezioni- 1857, Kriegsarchiv di Vienna
Padiglione Ufficiali -disegni storici, piante e sezioni- 1857, Kriegsarchiv di Vienna

The Officers’ Pavilion was built in 1856 to house Hapsburg army officers, their families and attendants, who were housed in the complex in 29 flats on the floor..

Since its origin, the building has therefore been used primarily for residential and administrative purposes. Later, part of the Pavilion was used as a Carabinieri barracks and for private associations supported by the Peschiera Municipality (Avis, Museo del Remo and Centro Sociale Anziani Arilica).

GREEN AREA

The landscaping of the green area and the promenade.

The restoration project foresees the rearrangement of the green area and the preservation of all high and low-trunk tree species in the portion facing the north elevation.

It is also planned to create a parking area for public services (car park) in grassed grating with driveways. All asphalt paving along this portion will be removed and replaced with porphyry, cobblestone and stone.

Along the south elevation, near the banks of the Canale di Mezzo, the current trees will be replaced with other species with a smaller root system, in order to restore the current promenade, made dangerous by the breaking and lifting of some parts of the pavement.

THE REVISION OF THE INTERIOR

Revision of the interior while respecting historical and architectural value

Given the particular historical importance of the building and its valuable architectural elements, the restoration work envisages the preservation of the structural system and its adaptation to the changed living, distribution and functional requirements of modern living.

The ground floor will be used for commercial purposes, while the first floor will be used for residential purposes with the addition of accommodation (Scheda d’ambito “Padiglione degli Ufficiali”, Piano degli Interventi- Piano Particolareggiato del centro storico – Scheda Norma).

VERTICAL CONNECTIONS

Vertical connections: original stairs and new lifts

The attic floor, once the rammed-earth layer has been removed for about 1.30 metres, will be used as a wellness centre.

The position of the stairs will remain unchanged, and since this is a three-storey building, compliance with Law 13/89, D.r.g. 1428/11 and subsequent amendments will be ensured through the insertion of four lift shafts in the immediate vicinity of the stairwells with an autonomous steel structure detached from the existing structures, but without protruding from the roof pitches.

ENVIRONMENTS AND USABILITY

The valorisation of vaults and old attics

The entire intervention, aimed at improving the hygiene and functionality of the areas and their usability, has the objective of not violating the integrity and nature of this building, trying to keep the structural system unaltered with particular attention to the conservation of the vaults and wooden ceilings.

SERVICE STRUCTURES

Redesigning service structures

The existing floor slabs have a wooden structure that is in a very poor state of preservation and with large areas of collapse, so the project involves replacing them with new floor decks with a solid wood structure of first class quality, with reinforced concrete floorboards and slabs anchored to the masonry with modest reinforced concrete connections, in order to create a rigid floor.

NEW ENVIRONMENTS

The breadth of the new environments

The building subject to intervention has a load-bearing structure in rock and brick in a good state of preservation and there are no cracks in the walls that would suggest current or past subsidence phenomena.

The project substantially maintains the existing structural scheme both in plan and in elevation (floors) and modifies it with internal openings to make the use of the new destination functional.

The internal distribution will be carried out with plasterboard walls which, being removable elements, are not invasive of the walls.

Distribuzione interna attuale
Distribuzione interna attuale
Distribuzione interna di progetto con nuove aperture
ROOF RESTORATION

Restoration of the original roof openings

With regard to the sloping roofs (pitches), the project foresees the reinsertion of the dormer windows, recovering the original image and historical identity of the building.

A careful investigation of the wooden structures revealed that most of the elements have large areas of decay, while the rest are of recent construction, including the perforated brick tiles and the roofing. All of this makes the workmanship of the different historical phases through which the building has passed somewhat unordered, and therefore they have been the object of a targeted design to make them homogeneous.

The reorganisation of the roof frames is also functional to seismic adjustment and energy saving through suitable insulation for the recovery of the attic and the entire building.

Nuova copertura lignea con aggiunta di abbaini
Nuova copertura lignea con aggiunta di abbaini
AESTHETIC CHARACTER

Facades and the aesthetic character of the building

Most of the façades now have exposed masonry and some parts are plastered; this situation was caused by the demolition of the plaster in the past to make the façades safe. The facades will be plastered again and painted with lime in a colour agreed upon by the superintendency.

On the south façade, doors will be opened at some windows, respecting the symmetry and geometry of the building façades to ensure the safety and flow of people on the ground floor for commercial use. 

Facciata allo stato attuale
Facciata allo stato attuale
Facciata con nuove aperture
Facciata con nuove aperture
TECHNICAL NOTES

The project foresees that the window frames and the shading system will be replaced with elements of the same shape, size and colour. The windows and doors will be fitted with double glazing in accordance with energy saving legislation.

For the thermal insulation of the building, reference is made to the indications and prescriptions of the relevant laws in force (law 10/91). All the technological systems of the project will be made in accordance with the law D.M. 37/08 and subsequent amendments and implementing regulations.

The thermal system for the production of hot water and cooling will be carried out by means of a water heat pump. Water will be drawn from and supplied to the Canale di Mezzo, located immediately to the south of the building; this type of technology makes it possible not to place external air conditioning units.

Heating and cooling inside the buildings will be carried out by means of fan coils, placed on the floors, and the vertical ducts of the system will be placed inside the existing flues.

For the water system and the methane system, the supply will be from the municipal distribution network with delivery by meters.

The electrical installation will be carried out according to the specific regulations in force.

White water will be disposed of on the ground, and black water will be conveyed to the municipal sewage system with a new connection. Black water from kitchen drains will first be settled in degreasing sumps and then conveyed to the municipal sewage system.

IL PADIGLIONE DEGLI UFFICIALI
PESCHIERA DEL GARDA
CONTACTS

FILL OUT THE FORM TO RECEIVE MORE INFORMATION

    Il Padiglione degli Ufficiali
    Copyright © 2020. Tutti i diritti riservati.
    Privacy Policy – Cookie Policy